Approvals & RERA in Himachal Pradesh

Which regime the project falls under, the NOCs it must collect, whether RERA applies, and how long a permission lasts.

What permissions do I need before building?

Five types per RERA 2016: (a) Plotted Development, (b) Group Housing, (c) Mixed Development (Residential+Commercial), (d) Commercial, (e) Integrated/New/Smart Townships. This platform currently optimises Group Housing.

Appendix-7 (2022) Reg 1 — and 6 related rules below.

The rules — all 7

Real Estate Project types

verbatim

Five types per RERA 2016: (a) Plotted Development, (b) Group Housing, (c) Mixed Development (Residential+Commercial), (d) Commercial, (e) Integrated/New/Smart Townships. This platform currently optimises Group Housing.

Appendix-7 (2022) Reg 1 · Appendix-7 (projects over 2,500 m²)

Statutory NOCs checklist

verbatim

Check List: HT/LT self-declaration; NH NOC only if abutting a National Highway (SH/scheduled roads: self-declaration under Road Side Land Control Act 1968); fire-safety self-declaration (HP Fire Safety Rules 2019, NOC at completion); IPH/CGWA water NOC; RWH; waste arrangements; street lighting; registered Town Planner/Architect/Engineer + Structural Engineer (Form 15 undertaking + soil investigation).

Appendix-7 (2022) Check List 21–29 · Appendix-7 (projects over 2,500 m²)

HP RERA registration

verbatim

Registration required when dwelling units exceed 8 OR plot area exceeds 500 m² (HP practice: triggered automatically above 2500 m²), irrespective of the number of land owners.

RERA 2016 §3 (HP RERA) · Appendix-7 (projects over 2,500 m²) · Appendix-1 (general buildings) · Appendix-8
Unit threshold 8
Area threshold m2 2500

Environmental clearance

verbatim

Environmental conditions for sanctioning building plans per MoEFCC Notification S.O. 3999(E) dated 9.12.2017 apply in toto in all Planning/Special/Deemed Planning Areas (built-up-area-slab EC regime).

Appendix-7 (2022) Reg 15(ii) · MoEFCC S.O. 3999(E) 9.12.2017 · Appendix-7 (projects over 2,500 m²)
Pop 1000
Sewage kld 50

Permission validity & alterations

verbatim

Planning permission is valid 3 years, renewable yearly @20% of the permission fee up to the declared completion period (Form-B, HP RERA Rules 2017). No alterations to sanctioned plans without written consent of 2/3 of allottees (+20% fee).

Appendix-7 (2022) Reg 3(iii)–(iv) · Appendix-7 (projects over 2,500 m²)
Years 3

Exemption eligibility

verbatim

Only original inhabitants who owned at commencement of the Act and their natural heirs (NOT purchasers in rural areas). Inform the Panchayat with jamabandi + tatima before starting.

Appendix-8 6(i)–(ii) · Appendix-8

Infrastructure handover & maintenance

verbatim

Promoter develops schools/hospitals/community buildings per layout and hands over to the local authority in running order; essential infrastructure (roads, footpaths, water, sewerage, street lighting) must be complete before handover; promoter maintains all services free of cost until transfer to society/ULB.

Appendix-7 (2022) Reg 3(v)–(vii) · Appendix-7 (projects over 2,500 m²)
Worked example — a 500 m² plot on a 9 m road

Computed live by the same engine that produces the drawings — not a stored example.

9 m road 2 m rear 3 m front 2 2 319 m²

Drawn square for clarity. A real tatima is not square — that is what the tracer is for.

RegimeAppendix-1 (General Building)
FAR1.75
Setbacks (F / R / sides) 3 / 2 / 2 m
Buildable footprint319 m²
Height cap21 m
Storeys3
Permissible built-up 875 m²
Parking required9 ECS

500 m² × FAR 1.75 = 875 m² permitted. The 319 m² footprint over 3 storeys could hold 956 m², so FAR is the binding constraint — the height allowance is not fully usable here.

Sources on this page
  • Appendix-7 (2022) Reg 1
  • Appendix-7 (2022) Check List 21–29
  • RERA 2016 §3 (HP RERA)
  • Appendix-7 (2022) Reg 15(ii) · MoEFCC S.O. 3999(E) 9.12.2017
  • Appendix-7 (2022) Reg 3(iii)–(iv)
  • Appendix-8 6(i)–(ii)
  • Appendix-7 (2022) Reg 3(v)–(vii)

Official text: HP Town and Country Planning Rules, 2014 ↗

Spotted something wrong?

Rules change and we would rather hear it from you than have somebody build to a stale number. No account needed.

Does your plot comply?

Trace your tatima and these 7 rules — and the 73 others — are checked against your actual boundary, with the number behind each verdict.

Check my plot → All Himachal Pradesh rules →
Ask AI

Nothing matched in the rulebook — try other words (parking, height, fire, setback, water…).

looking it up…

Answers come straight from the building rules for 12 states we cover, plus the glossary and calculators — each with its citation.