Real Estate Project types
verbatim
Five types per RERA 2016: (a) Plotted Development, (b) Group Housing, (c) Mixed Development (Residential+Commercial), (d) Commercial, (e) Integrated/New/Smart Townships. This platform currently optimises Group Housing.
Appendix-7 (2022) Reg 1
· Appendix-7 (projects over 2,500 m²)
Statutory NOCs checklist
verbatim
Check List: HT/LT self-declaration; NH NOC only if abutting a National Highway (SH/scheduled roads: self-declaration under Road Side Land Control Act 1968); fire-safety self-declaration (HP Fire Safety Rules 2019, NOC at completion); IPH/CGWA water NOC; RWH; waste arrangements; street lighting; registered Town Planner/Architect/Engineer + Structural Engineer (Form 15 undertaking + soil investigation).
Appendix-7 (2022) Check List 21–29
· Appendix-7 (projects over 2,500 m²)
HP RERA registration
verbatim
Registration required when dwelling units exceed 8 OR plot area exceeds 500 m² (HP practice: triggered automatically above 2500 m²), irrespective of the number of land owners.
RERA 2016 §3 (HP RERA)
· Appendix-7 (projects over 2,500 m²) · Appendix-1 (general buildings) · Appendix-8
| Unit threshold |
8 |
| Area threshold m2 |
2500 |
Environmental clearance
verbatim
Environmental conditions for sanctioning building plans per MoEFCC Notification S.O. 3999(E) dated 9.12.2017 apply in toto in all Planning/Special/Deemed Planning Areas (built-up-area-slab EC regime).
Appendix-7 (2022) Reg 15(ii) · MoEFCC S.O. 3999(E) 9.12.2017
· Appendix-7 (projects over 2,500 m²)
Permission validity & alterations
verbatim
Planning permission is valid 3 years, renewable yearly @20% of the permission fee up to the declared completion period (Form-B, HP RERA Rules 2017). No alterations to sanctioned plans without written consent of 2/3 of allottees (+20% fee).
Appendix-7 (2022) Reg 3(iii)–(iv)
· Appendix-7 (projects over 2,500 m²)
Exemption eligibility
verbatim
Only original inhabitants who owned at commencement of the Act and their natural heirs (NOT purchasers in rural areas). Inform the Panchayat with jamabandi + tatima before starting.
Appendix-8 6(i)–(ii)
· Appendix-8
Infrastructure handover & maintenance
verbatim
Promoter develops schools/hospitals/community buildings per layout and hands over to the local authority in running order; essential infrastructure (roads, footpaths, water, sewerage, street lighting) must be complete before handover; promoter maintains all services free of cost until transfer to society/ULB.
Appendix-7 (2022) Reg 3(v)–(vii)
· Appendix-7 (projects over 2,500 m²)