Water demand and storage, sewage treatment, waste, rainwater harvesting and the electrical rooms that go with them.

What services must the building provide?

Domestic demand 135 lpcd; storage = 1.5 days (UG tank + terrace tanks split ≈ 2:1), PLUS the fire reserve from the fire tier. IPH NOC for supply (App-7 Reg 14 verbatim).

NBC 2016 Part 9 §4 (135 lpcd) — verify — and 9 related rules below.

The rules — all 10

Water demand & storage

verify

Domestic demand 135 lpcd; storage = 1.5 days (UG tank + terrace tanks split ≈ 2:1), PLUS the fire reserve from the fire tier. IPH NOC for supply (App-7 Reg 14 verbatim).

NBC 2016 Part 9 §4 (135 lpcd) — verify · Appendix-7 (projects over 2,500 m²)
Lpcd 135
Storage days 1.5
Ug share 0.67

Sewage treatment (STP)

verify

Sewage ≈ 85% of water demand. Size the STP accordingly; if sewage >50 KLD the scheme ALSO triggers GoI Environmental Clearance (App-7 Reg 12(ii)). Treated water reused for flushing/landscape.

CPHEEO (80–85% of supply) — verify · EC trigger App-7 Reg 12(ii) verbatim · Appendix-7 (projects over 2,500 m²)
Sewage factor 0.85
Ec kld 50

Solid waste

verify

Segregated storage (wet/dry) — refuse room ≥1.1 m³ per 50 flats near the service entrance; dumper placement site reserved (App-7 Reg 22 verbatim); ground-floor garbage trolley route to the road.

SWM Rules 2016 + App-7 Reg 22 (dumper site verbatim) · Appendix-7 (projects over 2,500 m²)
M3 per 50 flats 1.1

Rain water harvesting

verbatim

Underground RWH @ 20 L/m² of roof-top area (non-drinking uses incl. fire-fighting). RWH structures allowed in setbacks below ground; community RWH permissible; NO water connection until the RWH system is operational; existing buildings must retrofit within 18 months.

Appendix-7 (2022) Reg 17 + General RWH regs (p.84) · Appendix-7 (projects over 2,500 m²) · Appendix-1 (general buildings) · Appendix-8
Litres per m2 20

Electrical: transformer, DG, rooms

verbatim

Load estimate ~3 KW/flat + common services. >50 KW → transformer space + 11 KV provision + HPSEB NOC (verbatim). Provide DG backup for lifts/common lighting (App-7 Reg 13(vi) verbatim) with a ventilated DG room outside the setback drives.

App-7 Reg 20 (verbatim >50 KW) + HPSEB practice · Appendix-7 (projects over 2,500 m²)
Kw per unit 3
Trigger kw 50

Transformer space

verbatim

If power assessment exceeds 50 KW, reserve transformer space in the layout (HPSEB verification + NOC).

Appendix-7 (2022) Reg 24 · Appendix-7 (projects over 2,500 m²)
Kw 50
Kw per unit 3

Plumbing shafts

verify

Stack bathrooms/kitchens vertically on shared shafts (0.6 × 1.2 m per pair of flats, accessible from lobbies); avoid offset stacks — every misaligned bathroom adds horizontal drainage under someone's ceiling.

NBC 2016 Part 9 practice — verify · Appendix-7 (projects over 2,500 m²)
Shaft 0.6×1.2 m

Refuse chute system

verbatim

A refuse chute system for domestic solid waste is MANDATORY for buildings exceeding 5 storeys.

Appendix-7 (2022) Reg 19 · Appendix-7 (projects over 2,500 m²)
Storeys 5

Service & maintenance access

verify

Terrace access to all roofs, ladder access to tanks, valve chambers on the drive, STP with truck access for desludging, meter room at ground level.

Design practice — verify · Appendix-7 (projects over 2,500 m²)

Infrastructure: street lights, ducts, water reservoir

verbatim

Street-light poles every 30.00 m on either side of roads; service ducts along roads; community water reservoir; dumper site reserved.

Appendix-7 (2022) Reg 25 · Appendix-7 (projects over 2,500 m²)
Light spacing m 30
5 of these 10 were encoded from secondary sources rather than read off the gazetted text — they carry a “verify” tag above. The engine applies them and the substance is believed correct, but confirm the exact figure against the notification before you build to it.
Worked example — a 500 m² plot on a 9 m road

Computed live by the same engine that produces the drawings — not a stored example.

9 m road 2 m rear 3 m front 2 2 319 m²

Drawn square for clarity. A real tatima is not square — that is what the tracer is for.

RegimeAppendix-1 (General Building)
FAR1.75
Setbacks (F / R / sides) 3 / 2 / 2 m
Buildable footprint319 m²
Height cap21 m
Storeys3
Permissible built-up 875 m²
Parking required9 ECS

500 m² × FAR 1.75 = 875 m² permitted. The 319 m² footprint over 3 storeys could hold 956 m², so FAR is the binding constraint — the height allowance is not fully usable here.

Sources on this page
  • NBC 2016 Part 9 §4 (135 lpcd) — verify
  • CPHEEO (80–85% of supply) — verify · EC trigger App-7 Reg 12(ii) verbatim
  • SWM Rules 2016 + App-7 Reg 22 (dumper site verbatim)
  • Appendix-7 (2022) Reg 17 + General RWH regs (p.84)
  • App-7 Reg 20 (verbatim >50 KW) + HPSEB practice
  • Appendix-7 (2022) Reg 24
  • NBC 2016 Part 9 practice — verify
  • Appendix-7 (2022) Reg 19
  • Design practice — verify
  • Appendix-7 (2022) Reg 25

Official text: HP Town and Country Planning Rules, 2014 ↗

Spotted something wrong?

Rules change and we would rather hear it from you than have somebody build to a stale number. No account needed.

Does your plot comply?

Trace your tatima and these 10 rules — and the 70 others — are checked against your actual boundary, with the number behind each verdict.

Check my plot → All Himachal Pradesh rules →
Ask AI

Nothing matched in the rulebook — try other words (parking, height, fire, setback, water…).

looking it up…

Answers come straight from the building rules for 12 states we cover, plus the glossary and calculators — each with its citation.